New Hampshire Asset Management Plan for Pavements & Bridges on the National Highway System


Published: 2019

The New Hampshire Asset Management Plan for Pavements & Bridges on the National Highway System is available here.


Document summary:

This plan identifies risk-based analyses and processes to support the efficient allocation of New Hampshire DOT's resources. Its goal is to maintain assets in a State of Good Repair and reduce any potential system risks. The New Hampshire DOT worked with the state's four metropolitan planning organizations to provide a 10-year roadmap for the strategic management of NHS bridge and pavement assets.

This document includes the following sections: Asset Valuation, Current Methods and Tools, Financial Plan, Introduction, Inventory and Condition, Investment Strategies, Lifecycle Management, Objectives and Measures, Performance Assessment, Process Improvements, Regulatory and Legislative Requirements, Risk Management.
This document meets the following additional criteria:
• Asset valuation included
• Defines linkages to other planning & programming documents
• Future cost/performance projections are based on management system analysis (e.g. HERS, dTIMS)
• Includes a review of agency roles and responsibilities for TAM
• Includes analysis of future demand impacts on asset needs
• Includes estimates of future maintenance costs
• Includes estimates of future rehabilitation, replacement, reconstruction, and/or renewal costs
• Includes formal risk assessment results such as a risk register
• Includes strategies for multiple funding scenarios
• Includes substantive list of process, data, and/or systems improvement actions
• Investment strategies consistent with and linked to capital program
• Investment strategies summarize planned capital and operating expenditures
• Key revenue projection assumptions identified
• Performance/LOS targets are linked to agency goals/objectives
• Risk assessment results incorporated into investment strategies.
The modal scope of this document is: Highway Only.
The asset scope of this document is: Highway Assets, Pavement and bridge only.
External link (if available): Direct link