West Virginia DOH TAMP


Published: 2019

The West Virginia DOH TAMP is available here.


Document summary:

The West Virginia TAMP guides asset management for National Highway System bridge and pavement assets. Through a robust 10-year analysis, many performance targets, and investment strategies, the TAMP equips WVDOH with the tools it needs to effectively manage their highway assets.

This document includes the following sections: Asset Valuation, Current Methods and Tools, Data Management, Financial Plan, Introduction, Inventory and Condition, Investment Strategies, Lifecycle Management, Objectives and Measures, Performance Assessment, Regulatory and Legislative Requirements, Risk Management.
This document meets the following additional criteria:
• Asset valuation included
• Defines linkages to other planning & programming documents
• Future cost/performance projections are based on management system analysis (e.g. HERS, dTIMS)
• Includes estimates of future maintenance costs
• Includes estimates of future rehabilitation, replacement, reconstruction, and/or renewal costs
• Includes formal risk assessment results such as a risk register
• Includes future projected asset condition
• Includes strategies for multiple funding scenarios
• Investment strategies consistent with and linked to capital program
• Investment strategies summarize planned capital and operating expenditures
• Key revenue projection assumptions identified
• Performance/LOS targets are linked to agency goals/objectives.
The modal scope of this document is: Highway Only.
The asset scope of this document is: Highway Assets, Pavement and bridge only.
External link (if available): Direct link