The DC DOT TAMP is available here.
Document summary:
DC's Transportation Asset Management Plan establishes DC's ten-year plan for the maintenance, preservation, repair, rehabilitation and replacement of their bridge, pavement and tunnel assets. The TAMP focuses on performance-based decision-making, lifecycle planning and risk management to meet their asset management needs.
This document includes the following sections: Asset Valuation, Current Methods and Tools, Data Management, Financial Plan, Introduction, Inventory and Condition, Investment Strategies, Lifecycle Management, Objectives and Measures, Performance Assessment, Process Improvements, Risk Management.
This document meets the following additional criteria: • Asset valuation included • Defines linkages to other planning & programming documents • Future cost/performance projections are based on management system analysis (e.g. HERS, dTIMS) • Includes a review of agency roles and responsibilities for TAM • Includes cost projections for meeting performance or LOS targets • Includes estimates of future maintenance costs • Includes estimates of future rehabilitation, replacement, reconstruction, and/or renewal costs • Includes formal risk assessment results such as a risk register • Includes future projected asset condition • Includes strategies for multiple funding scenarios • Includes substantive list of process, data, and/or systems improvement actions • Investment strategies consistent with and linked to capital program • Investment strategies summarize planned capital and operating expenditures • Key revenue projection assumptions identified • Risk assessment results incorporated into investment strategies.
The modal scope of this document is: Highway Only.
The asset scope of this document is: Includes other highway assets, Pavement and bridge only, Tunnels.
External link (if available): Direct link